Sakura Class OPV 3D Model

Not Rated Yet











! REPORT
NOTE: DIGITAL DOWNLOAD, NOT A PHYSICAL ITEM

Add to Collection

0 Likes
Offered By
License
Extended Use License (IP Restricted)
This item comes with our Extended Use Licensing. This means that you may use the model in a variety of mediums and applications. But, because certain intellectual property depicted in this model may not be affiliated with or endorsed by the original rights holder, this model is subject to an Editorial Use Only Restriction which limits the ways in which you may use this model.
For full license terms, see our 3D Content Licensing Agreement
3D Model Details
Statistics
| Favorites: | 0 |
| Likes: | 0 |
| Views: | 10 |
Item Ratings

Not Rated Yet
Sakura Class OPV 3D Model
The new patrol vessels measure 95 meters in length, with a standard displacement of 1,900 tons, a depth of 7.7 meters, a draft of 4.2 meters, and a top speed of 25 knots (28.8 mph). Like the Mogami-class frigates (FFM), their hulls are designed with a strong emphasis on stealth. In addition, automation technologies have been implemented to reduce crew requirements, limiting the necessary personnel to just 30. This is only one-third of the crew of the Mogami-class, which also prioritizes reduced manpower, with about 90 personnel.
The Sakura (with pennant number OPV 901) and Tachibana (OPV 902) were only recently laid down on February 14, 2025. In June, the Sakura began the “block assemblyprocess, in which hull sections are joined together in the dock, followed by the start of block assembly for the Tachibana as well. According to the JMSDF Maritime Staff Office, after outfitting and various performance tests, the Sakura is scheduled to be commissioned in January 2027, followed by the Tachibana in February of the same year.
The Sakura (with pennant number OPV 901) and Tachibana (OPV 902) were only recently laid down on February 14, 2025. In June, the Sakura began the “block assemblyprocess, in which hull sections are joined together in the dock, followed by the start of block assembly for the Tachibana as well. According to the JMSDF Maritime Staff Office, after outfitting and various performance tests, the Sakura is scheduled to be commissioned in January 2027, followed by the Tachibana in February of the same year.
















